Mast and standing rigging

/// Total makeover of the masts, the standing and running rigging.

A professional was hired to replace all standing rigging (the wires) and to advise us of any other servicing necessary.

New gooseneck was designed, boom-vang fitting and staysail deflector - all over-engineered and made to withstand heavy forces.

Replacement of all monel rivets, chainplates, all electrics and sheaves.

This was a 4-month long process, that ensures high safety standards and peace of mind. Additionally, the electrics are now operating well and the sails can be controlled perfectly.

While the masts were down, we also gave the deck a new coat of paint and anti-slip, all in 2-part polyurethane paint. Looks good!

20250131_111233
20250609_143841
20250504_183742
20250510_111659
20250530_184052
20250509_195541
20250510_111648
20250509_195615
20250510_111654
20250330_135002
20250307_203950
20250406_115937
20250307_204100
20250501_153951
20250412_183026
20250601_134133
20250524_161037
20250524_161018
20250524_161023
  • Facebook
  • Instagram

© 2020-23 Astarte. All photos and material are copyright, except where indicated.
Do contact us if you would like to use any of the material provided.
astarte@antidot.gr

bottom of page