top of page
AFT CABIN
/// The aft cabin was renovated fully, including strengthening of the chainplates and autopilot installation (and full rewiring)
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|---|---|---|---|---|---|
![]() |
Lining and MATERIALS
The refurbishment was total - all materials were removed, all the way to the hull.
Here are some photos of the process, including dimensioning.






bottom of page